Whole-building air leakage testing for commercial projects
A commercial air leakage test measures how much air escapes through a building's outer shell. Large fans pressurize or depressurize the whole building, and we record the airflow needed to hold a set pressure. The result is compared with the limit your local code sets. We also find leaks, so a failed building can be fixed and retested. Coming soon: we are adding code compliance testing, and getting the certifications now. Tell us about your project and we will tell you where we are.
01What it includes
A test of the shell, a leak search and a report
- 01
Test planning
We read the plans, find the building envelope area and decide how many fans the building needs. We have a blower door frame that holds three fans, for larger buildings.
- 02
Building preparation
Intentional openings such as dampers and vents are closed or sealed, and the mechanical systems are set for the test. We send a checklist to the contractor ahead of time.
- 03
The test
Fans are set in an exterior door frame. We take readings at several pressures, and record weather and temperature on the day.
- 04
Leak finding
While the building is pressurized, we use infrared imaging and smoke to find leaks at the roof edge, wall joints, penetrations, dock doors and glazing frames.
- 05
Retest
After the contractor seals the leaks, we test again. Many teams book a mid-construction test and a final test.
- 06
Written report
The report records the building, the date, the method, the envelope area, the result and the limit, in a clear format.
02The standard
Limits set by Larimer County and Fort Collins
The limit is a leakage rate: cubic feet per minute of air (cfm) for each square foot of building envelope, measured at 75 pascals. A lower number means a tighter building.
Other jurisdictions set their own limits. Confirm the code edition and limit with your building department.
03How it works
Getting a commercial building to pass
Know the limit
We confirm which code and limit apply to the project and who needs the report.
Test mid-construction if you can
Once the barrier is in place and still exposed, a test finds problems that are cheap to fix.
Final test
When the building is closed in and the mechanical systems are set, we run the test that counts and issue the report.
If it fails
We give a leak list.
What you receive
- The measured leakage rate and the stated limit
- The test method and equipment used
- Envelope area and how it was found
- Leak locations from infrared and smoke
- A written report for your file
04Who and when
Who needs a commercial air leakage test
Who it is for
- General contractors on new commercial buildings, additions and major renovations.
- Architects who detailed the air barrier and want proof it works.
- Owners who want a tight, efficient building and lower bills.
- Mechanical engineers sizing equipment for a tight shell.
When you need it
- After an envelope retrofit.
- When a building is hard to heat or cool.

In the field
An infrared camera shows where outside air is getting in.
An infrared camera, its screen showing a thermal image of a wall.
05Duct leakage testing
Duct leakage tests for commercial air systems
Ducts that leak lose conditioned air to ceilings, shafts and roofs. A duct leakage test finds out how much. It is often tied to a mechanical spec or a code.
- 01
What is tested
Supply, return and exhaust duct sections, on rooftop units, split systems and air handlers. A fan pressurizes a sealed section and we measure the airflow needed to hold a set pressure.
- 02
Sections or whole systems
On large jobs, a spec may test sections as they go in, before ceilings close. On smaller jobs, the whole system may be tested at the end.
- 03
The standard and limit
The limit comes from the project spec or the code your jurisdiction adopted. Commercial duct jobs often reference a duct construction standard.
- 04
If a system fails
We point to the likely leak, the contractor seals it, and we retest and report the new result.
What is air barrier testing?
It is a test of how well a building's outer shell blocks air. We pressurize the whole building with fans and measure how much air leaks through. The result is shown as cubic feet per minute for each square foot of envelope.
What are the commercial air leakage requirements?
They depend on your jurisdiction. Larimer County sets 0.35 cfm per square foot at 75 pascals for commercial buildings. Fort Collins sets 0.25 for new buildings, additions and major renovations. Check your own building department.
Which test standard applies?
The Fort Collins protocol names ASTM E779 or ASTM E1827 for commercial buildings. ASTM E3158 and ANSI/RESNET/ICC 380 also appear in local residential rules.
How much does an air barrier test cost?
It depends on the building's size and how many fans it needs. Our frame holds three fans for larger buildings.
What happens if we fail?
We give you a list of where the air is getting in. Your contractor seals those spots, and we retest. The retest result goes into the report.
07Keep going
Related services
More from Commercial
The same service, other buildings
Talk to us about your building
Tell us what brought you here: the bills, a rebate, a test or a deadline.
Monday to Friday, 8:00am to 5:00pm. Based in Fort Collins, Colorado.