02Multifamily
Blower door testing for apartments and condos
A blower door test measures how leaky a space is. In a multifamily building we test single units, groups of units or the whole building. We also measure how much air passes between neighboring units. You get a written report with the numbers, the method and a list of leaks to fix if a unit fails. Coming soon: we are adding code compliance testing, and getting the certifications now. Tell us about your project and we will tell you where we are.
01What it includes
Tests for the unit, the floor and the whole building
- 01
Unit enclosure test
A fan is sealed into the unit's door. It pulls the air pressure down to 50 pascals (a light, steady push), and we record how much air the fan moves to hold it there. That number, divided by the unit's enclosure area, is the result.
- 02
Compartmentalization
In an apartment building, air leaks through shared walls, floors and shafts as well as to the outdoors. Compartmentalization looks at how well each unit is sealed off from its neighbors.
- 03
Guarded testing
In a guarded test, neighboring spaces are held at the same pressure as the unit being tested. Then little air crosses the shared surfaces, and the reading shows leakage to the outdoors.
- 04
Leak finding
While the fan runs, we trace leaks with an infrared camera and by hand. Common trouble spots are outlets, plumbing and wiring penetrations, rim areas and shaft openings.
- 05
Written report
Each test is logged with the address, unit, date, tester, test method, enclosure area and result, so the file is complete and easy to check.
02The standard
What Fort Collins requires in multifamily buildings
Pass numbers come from the jurisdiction that adopted the code. Fort Collins publishes a protocol for stacked units. Check the number for your city or county before you schedule.
Other cities and counties set their own numbers.
03How it works
Planning a multifamily test day
Confirm the rule
We check which standard and pass number apply to your project and who must receive the report.
Pick the units
We build a sampling plan from your unit list. On large buildings we usually test about 10% of the units, with a sample of each unit type. Some programs require a blower door on every unit at the same time. Others let us test one unit.
Prepare the units
Doors and windows closed, mechanical equipment set for the test, and the air handler and exhaust fans off. We send a short checklist for crews and residents.
Report and retest
We send results fast so a failed unit can be sealed and tested again. The plan says what happens next, based on your protocol.
What you receive
- Test results for each unit, with the enclosure area
- The test method and equipment used
- A pass or fail line against the stated limit
- Leak locations for any failed unit
- A written report for your file
04Who and when
When a multifamily owner or developer needs the test
Who it is for
- See New Construction.
- General contractors managing the schedule on a stacked-unit project.
- Owners of existing buildings who want a before and after measurement of an air-sealing project.
When you need it
- Before drywall, if you want a chance to fix leaks cheaply. After drywall, the test shows the final result.
- At the end of an air-sealing or retrofit phase.
- When a program or building official asks for a test report.
- When a resident reports drafts or smells from a neighbor's unit.

In the field
An infrared camera shows where outside air is getting in.
An infrared camera, its screen showing a thermal image of a wall.
05Duct leakage testing
Duct leakage tests for the systems serving each unit
Where a unit has its own ducted heating and cooling system, leaky ducts waste air before it reaches the room. A duct test measures that loss. It can be done at the same visit as the blower door test.
- 01
What the test measures
We seal the supply and return openings, connect a fan and gauge to the duct system, and bring it to a set pressure. The fan flow needed to hold that pressure is the leakage.
- 02
Total leakage and leakage to outside
Total leakage counts every leak in the duct system. Leakage to outside counts only air that escapes to the outdoors. Your plans or program rules say which one applies.
- 03
When it is done
At rough-in, with the ducts exposed, leaks are easy to fix. At final, the test confirms the finished system. Some projects need both.
- 04
Same visit as the air test
A crew already in the unit with a blower door can often run the duct test at once, which saves a second trip and a second round of prep.
- 05
When a system fails
We point to likely leak locations. After the contractor seals them, we test again and report the new number.
- 06
The limit and method
The pass number comes from the code your jurisdiction adopted or from a program's rules. We do not quote one here.
What is compartmentalization, and how is that test different?
Compartmentalization is how well each unit is sealed from neighboring units, halls and shafts. The test finds leakage that crosses shared walls and floors, which matters for smoke, odors, noise and comfort.
Guarded or unguarded blower door test: which one applies?
An unguarded test measures all leakage from a unit, including air from neighbors. A guarded test holds neighbors at the same pressure, so it isolates leakage to the outdoors. Your code or program says which one is required.
What does my city require, and what is the pass number?
It depends on the city or county. Fort Collins sets 0.27 cfm50 per square foot of unit enclosure area for stacked units. Other places differ, so we check the adopted code before we test.
How many units get tested, and what happens when one fails?
Fort Collins asks for seven units or 20 percent, whichever is greater, in buildings with eight or more units. In general we test about 10% of units on large buildings, with a sample of each unit type. Some programs need every unit tested at the same time. A failed unit is sealed and tested again. Ask the building department how a fail affects the rest of the sample.
When in construction should we test?
Many teams test before drywall when leaks are easy to reach, then test again at the end. Which test the building official counts depends on the jurisdiction.
07Keep going
Related services
More from Multifamily
The same service, other buildings
Talk to us about your property
Tell us about the building or the portfolio, and what you need from it.
Monday to Friday, 8:00am to 5:00pm. Based in Fort Collins, Colorado.
